Sydney Train Control Center

Submitted By

Sydney Train Control Center
Contact Us
Description
Documents

Governmental transportation authorities require an immense amount of information to be distributed, analyzed, and acted upon simultaneously to ensure the efficient and unbroken operation of their services. For the Sydney Trains agency in Sydney, Australia, their first step to optimizing their efficiency –and thus their passenger experience– was merging their six different monitoring locations into one central hub, from which they could more cohesively administrate the day-to-day operations of their 178 stations. This new Rail Operations Centre (ROC), positioned near the Green Square Station in the inner-city Sydney suburb of Alexandria, had to be capable of not only receiving every piece of information Sydney Trains required to run their operation but it also needed to deliver this information to each of the estimated 100 staff members who will be working the ROC’s main floor. Taking inspiration from what other command and control centers have done in the face of similar challenges, Sydney Trains concluded they needed a massive digital display. But what kind?

The Challenge:

While Sydney Trains understood that a large-format digital display was the most effective and efficient way to communicate the vast swaths of information their employees needed to manage the railway’s day-to-day operation, they weren’t particularly well versed in how display technology worked. Recognizing their lack of familiarity with their desired technology as their first challenge, the team from Sydney Trains on-boarded the Australian integration firm Critical Room Solutions (CRS) and the technology consultant Digital Place Solutions (DPS). This trio proceeded together to diagnose each of the obstacles the ROC would present. First, the sheer volume of staff moving around the main floor meant the display had to be massive enough to showcase the entire rail network to the whole team while still maintaining a tight enough pixel pitch to show acute details to staff members with a more precise focus. The futuristic interior of the ROC mandated a modern solution to match it and the high levels of natural light in the space set a high brightness threshold. The intended on-time of the display posed another challenge: with the railway running 24/7 that meant the display had to be, too. “Essentially, it’s like a NASA command and control center for the entire rail network,” said Gerry Thorley, the co-founder of DPS, of the new ROC. Facing complex challenges and the high stakes of a public infrastructure project, the Sydney Trains ROC project presented a tall task.

The Solution:

2017 marked the beginning of discussions between CRS, DPS, and Sydney Trains to identify the best possible solution for the “Operational Visual Display Screen” (OVDS) in their new ROC control center. According to John Kimenkowski of CRS, “Sydney Trains was initially looking at a cube wall for this installation because that is what they used in prior control centers.” This route proved untenable in the ROC. In both weight, brightness, and sheer size, projection cube walls resemble the bulky home televisions from decades past. The massive machines take up far more space than Sydney Trains was looking to dedicate to their new display solution and these outdated, bezel-filled videowalls are also known to exhibit brightness variations alongside bothersome maintenance frequency. Instead of these bulky cubes, continued Kimenkowski, “we presented the option of LED display technology for several reasons and once we made that pitch, NanoLumens quickly became the solutions provider of choice.” Brighter, thinner, and less than half the weight of cube wall technology, NanoLumens LED displays provided Sydney Trains with precisely the bezel-free display wall they were looking for with a 1.6 millimeter pixel pitch Performance Series LED display, measuring 106.4 feet wide by 11.8 feet tall With over 41 million pixels, the display contains the largest number of processors ever installed in an LED display.

The Results:

Though Sydney Trains is yet to move their entire team to the ROC, the NanoLumens OVDS has transformed the way the new headquarters monitors the entire rail system. Tony Eid, the Sydney Trains Executive Director, confirmed as much, saying, “the Operational Visual Display Screen plays a key role in providing the control center real-time information to make informed decisions with train operations, incident and customer management,” among other tasks. Referred to as the “WOW board,” the huge NanoLumens display contains the equivalent of 20 windows of full high definition resolution without the need for scaling and occupies far less space than any alternative display solution would have – especially projection cube walls. “For the first time in our history,” Eid continued, “we have managed to bring together and consolidate multiple control centers in the one location.” The NanoLumens OVDS is what makes that possible. The first of its kind in Australia, it allows ROC staff to masterfully control their entire network of trains, stations, tunnels, and railways for the millions of daily customers relying on Sydney Trains to deliver a safe and swift journey. “The NanoLumens wall, which is what this display really is,” adds Gerry Thorley in conclusion, “is central to the main operations of this command and control center for the entire rail network…[it] provides the centerpiece for the continued world class operation of this growing railway system.

The Technology:

The NanoLumens Operational Visual Display Screen is a Performance Series™ display with a 1.6 mm pixel pitch. Measuring 106.4 feet (32.4 meters) wide by 11.8 feet (3.6 meters) tall, the display contains over 41 million pixels. It is the central feature of the Sydney Trains Rail Operations Center, located within Sydney in the suburb of Alexandria. 